Photos of the First Large Beam Installed by Local 150
It was very exciting watching these guys work on the installation of the big beams this past Thursday. The weather was blustery with gusts over 20 mph, but the professionals got it done. Thanks so much Local 150 guys! You are awesome!
This slideshow requires JavaScript.
December 18, 2011 | Categories: Uncategorized | Tags: Big Beam One, Local 150 Operating Engineers | Leave A Comment »

